The last CSSCT-E was held on September 18, 2026.
1) Review of workplace and commuting accidents..
As of August 31, 2026, 7 workplace accidents resulting in time off work have been recorded.
The Airbus SAS FR1 (Frequency Rate 1) stands at 0.52, against a target of 0.53.
2) Occupationnal Health Service: update on areas involving Psychosocial Risck (PSR)..
Data for the first quarter of 2026:
- 433 consultations for PSR at AI SAS (2.43% of employees).
- A higher proportion observed among women.
Occupational health services recommend that employees seek consultation at the first sign of issues (employee-initiated visits to occupational health are strictly confidential).
3) Part-time work arrangements and medical accomodations.
Therapeutic Part-Time Work (maximum duration of 6 months):
- A phased return-to-work scheme compensated by Social Security via a standard administrative form (CERFA).
- Terms defined jointly by the occupational physician, the HRBP, and the manager, then forwarded to the payroll department (Reward).
- Volume: 157 cases in the first half of 2026 (between 600 and 1,000 per year for Commercial Aircraft).
Part-Time Work for Personal Convenience and Medical Reasons:
Based on the Group QVCTG (Quality of Life and Working Conditions) agreement. Initiated via the HRBP upon the occupational physician's recommendation (no CERFA form required).
Formalized via a contract amendment renewable on December 31 (often combined with a disability pension).
Medical remote work: 427 accommodation requests processed during the first six months of 2026.
4)Decarbonation and enegy projects. ENGIE geothermal partnership.
- Installation of geothermal heat pumps with vertical probes (cooling recovery in summer and heat recovery in winter).
- Campus 1: Location behind MQ3 extending to the Gascogne car park (commissioning scheduled for 2029).
- Campus 2: Location at the Velazquez North car park (geothermal + photovoltaic canopies; commissioning scheduled for 2029).
5) Car and bicycle parking.
Car parking:
- To offset delays with the P1/P2 car parks on the Bellonte side, several options are being studied: B28 (+60 spaces), D50 (+80 spaces, acquisition of DGA land), and Velazquez North (+96 spaces).
- Project for dynamic signage displaying the number of available spaces at car park entrances.
- Enhanced monitoring of P22 (numerous near-miss reports logged in FISH).
Bicycle parking and VélôToulouse:
- Current occupancy rate for bicycle parking is approximately 66%.
- Project B49: Converting car parking spaces into a large bicycle parking facility with 494 spaces (delivery early 2027; study underway to preserve trees). Addition of changing rooms planned for 2027.
- Installation of additional bike racks at P22, H10, P58, and the Clerc car park.
- VélôToulouse: Current usage rate of 16 rentals/day at Velazquez and 18 at Servanty. Expansion under review with Blagnac/Tisséo: addition of 7 stations in Colomiers by the end of September, with another 8 stations to be added by the end of 2027.
6) Construction and Facilities Forecast.
- Campus 1 Project P1/P2: Entry-into-service date currently being finalized for the next quarterly CSSCT-E meeting.
- Building B04: Installation of accessible (ADA-compliant) restrooms (men/women) on all floors in 2027.
- R06 Dining Facility: Study underway to enclose certain outdoor areas to increase winter seating capacity.
- Building Updates:
B28: Mothballed (taken out of service) as it is currently vacant. Demolition postponed due to interconnection with R02 (requires relocating R02 first).
B16 / B29: B29 to be retained permanently. Consideration underway to consolidate "Function V" activities into B16.
7) Miscellaneous Items and Maintenance.
- B22 / B75 Air Conditioning: Breakdowns caused by obsolete electronic control boards in fan-coil units. Quote approval in progress for full replacement by early 2027 (boards come with a 20-year warranty).
- Smoking Areas & Ashtrays: Layout review for Campuses 1, 2, and 3 following fire incidents and smoke infiltration (notably at B22). Rule applied: must be located more than 5 meters from buildings; removal of the B22 ashtray in favor of an intermediate zone between B22 and B26.
- EV Charging Stations: CUBE company currently in court-ordered liquidation. Creation of 20 parking spaces at Santos Dumont scheduled for January 2027, with the selection of a new global provider currently underway (feasibility study covering all parking areas, including P22).
- B22/P22 elevators: B22 and P22 elevators back in service; enhanced monitoring of the service provider required.
The next quarterly meeting of the CSSCT-E will be held on December 04, 2026.